Structural review build — anything labelled "Sample data" is not Mahakrang’s real information
MAHAKRANG CONCRETEMore than concrete — steadiness for every future
MHK LAB — Back to the lab

Test details

A technician holding a cylinder specimen Sample image Batch BBT-03

Stage: CylinderSample image — cylinder specimen

Image uploaded: 24 Sept 2026, 05:59 (Bangkok time)

Batch BBT-03

Facility: Mahakrang plant

Produced

Sampled

Sample data Under review Published ·

Concrete 320 · cylinder specimens

Example batch tested on cylinders (a different basis from cubes)

See the mix Concrete 320
Call us081-997-9994

All times are Bangkok time (UTC+7)

Measurements in this batch

Key results

Slump
12cm
Target 12 ± 2 cm
7-day strength
248ksc
Cylinder
28-day strength
336ksc
Cylinder

Slump

12cm

Target 12 ± 2 cm

Specimen
Slump cone
Concrete age
Fresh concrete
Tested
Method
Not stated
Target / criterion
12 ± 2 cm
Entry status
Checked

Compressive strength

  • Cylinder · ksc
Compressive strength · Batch BBT-03 Cylinder: 7 days 248 ksc, 28 days 336 ksc 0100200300400 0728 Concrete age (days) Strength (ksc) 248336 Compressive strength · Batch BBT-03 Cylinder: 7 days 248 ksc, 28 days 336 ksc 0100200300400 0728 Concrete age (days) Strength (ksc) 248336

Only recorded values are plotted; nothing is estimated between them

Show the data as a table
Recorded strength results for Batch BBT-03 · Cylinder
AgeResultTested
7 days 248 ksc
28 days 336 ksc

QC status

Under review

The results are with a reviewer

CriterionNo published criterion yet

Test summary

Sample data — awaiting a reviewer’s decision

No report file has been published yet

Materials used in this batch

View all

Questions about this result, or about concrete for your job?

Call the team directly about test results, mixes, scheduling and price

Call us081-997-9994

Volume calculator

Choose the concrete

Works out the volume of the shape you describe. It does not choose thickness, reinforcement or strength for you.

Shape of the pour

Dimensions

Dimensions — Slab / path

Allowance

Starts at 0%. Add some if the ground is uneven or formwork may bulge (up to 20%)

Menu