Checking the curing tank Sample image Batch BBT-02

Stage: CuringSample image — curing tank

Image uploaded: 24 Sept 2026, 05:59 (Bangkok time)

Batch BBT-02

Facility: Mahakrang plant

Produced

Sampled

Sample data Pending Published ·

Concrete 240 (sample)

Example batch still waiting for its 28-day result

See the mix Concrete 240
Call us081-997-9994

All times are Bangkok time (UTC+7)

Measurements in this batch

Key results

Slump
9.5cm
Target 10 ± 2 cm
7-day strength
205ksc
Cube
28-day strength
no value yet
Awaiting result

Slump

9.5cm

Target 10 ± 2 cm

Specimen
Slump cone
Concrete age
Fresh concrete
Tested
Method
Not stated
Target / criterion
10 ± 2 cm
Entry status
Checked

Compressive strength

  • Cube · ksc
Compressive strength · Batch BBT-02 Cube: 7 days 205 ksc; 28 days Awaiting result 050100150200250 0728 Concrete age (days) Strength (ksc) 28 days · pending 205 Compressive strength · Batch BBT-02 Cube: 7 days 205 ksc; 28 days Awaiting result 050100150200250 0728 Concrete age (days) Strength (ksc) 28 days · pending 205

Only recorded values are plotted; nothing is estimated between them

Show the data as a table
Recorded strength results for Batch BBT-02 · Cube
AgeResultTested
7 days 205 ksc
28 days Awaiting result Awaiting result

QC status

Pending

This batch has not been assessed yet

CriterionNo published criterion yet

Test summary

Sample data — the 28-day strength is still pending

No report file has been published yet

Materials used in this batch

View all

Questions about this result, or about concrete for your job?

Call the team directly about test results, mixes, scheduling and price

Call us081-997-9994

Volume calculator

Choose the concrete

Works out the volume of the shape you describe. It does not choose thickness, reinforcement or strength for you.

Shape of the pour

Dimensions

Dimensions — Slab / path

Allowance

Starts at 0%. Add some if the ground is uneven or formwork may bulge (up to 20%)